Skip navigation
Statistics
Help
About OPUS
How to Deposit
Managing Copyright
Browse
UTS Organisational Groups
Browse Items by:
Issue Date
Author
Title
Type
ARC/NHRMC Funded
Search OPUS
OPUS at UTS
Browsing byARC/NHMRC Funded
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
or enter first few letters:
Sort by:
title
issue date
submit date
ARC/NHRMC funded
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 13631 to 13650 of 103803
< previous
next >
Issue Date
Title
Author(s)
2023-04-13
My V2X EV: Informing strategic electric vehicle integration
Dwyer, S
2023-01-01
The Australian Electricity Workforce for the 2022 Integrated System Plan: Projections to 2050.
Rutovitz, J
;
Langdon, R
;
Mey, F
;
Briggs, C
2021-07-02
E1 Theme: Trust-building for collaborative win-win customer solutions. Opportunity Assessment Roadmap Report
Russell-Bennett, R
;
Kuch, D
;
Riedy, C
;
Gardner, J
;
Chong, HYJ
;
Niklas, S
;
Clements, A
;
Flew, T
;
Mathmann, F
;
McAndrew, R
;
Letheren, K
;
Minunno, R
;
Amin, R
;
Goulding, B
;
Zimbatu, A
;
Whittaker, L
2021-08-01
Opportunity Assessment: Network Visibility and Optimising Hosting Capacity
Dwyer, S
;
Braslavsky, J
;
Graham, P
;
Havas, L
;
Heslop, S
;
Hossain, J
;
Ibrahim, I
;
Amin, R
;
Khorasany, M
;
Langham, E
;
Nagrath, K
;
Guerrero Orbe, J
;
Razzaghi, R
;
Sherman, J
;
Spak, B
2022-12-01
Local DER Network Solutions. Opportunity Assessment in N3 for RACE for 2030
Wright, S
;
Dwyer, S
2021-08-01
N1 Opportunity Assessment: Electric Vehicles and the Grid.
Dwyer, S
;
Dargaville, R
;
Nagrath, K
;
Thorpe, A
;
Milton, A
;
James, B
;
McGrath, B
;
Hargroves, C
;
Kuch, D
;
Meegahapola, L
;
Newman, P
;
Paevere, P
2022-12-01
Industry 4.0 for energy productivity – Opportunity Assessment for Research Theme B2, Final Report
Trianni, A
;
Bennett, N
;
Lindsay, D
2020-08-13
A short overview of the research undertaken by UTS to improve the safety and welfare of greyhounds
Eager, D
2020-08-01
A review of the track shapes, cross-fall, race dynamics and injury rates for RWWA
Eager, D
;
Hossain, MI
;
Hayati, H
;
Mahdavi, F
2020-09-21
RWWA Report 3 - Track surface maintenance - Cannington Mandurah and Northam greyhound tracks
Eager, D
;
Hossain, MI
2020-09-01
RWWA Report 2 - Starting Box and Catch Pens - Cannington Mandurah and Northam greyhound tracks
Eager, D
;
Hossain, MI
2021-03-30
Report 8 Mandurah greyhound track upgrade - Design~3 catching pen analysis
Hossain, I
;
Eager, D
-
GBGC Industry Stackholder Engagement - Open Forum for participants
Eager, D
-
GBGC Industry Stackholder Engagement - Ipswich GRC
Eager, D
2020-11-30
Greater Brisbane Greyhound Centre - Analysis of 6 starts for the 2-turn track
Eager, D
;
Hossain, I
-
GBGC Industry Stackholder Engagement - QRIC
Eager, D
-
GBGC Industry Stackholder Engagement - Greyhound Advisory Panel
Eager, D
-
GBGC Industry Stackholder Engagement - Interstate learnings
Eager, D
-
GBGC Industry Stackholder Engagement - Tom Tzouvelis Trainers Group
Eager, D
2021-01-11
GBGC 2-turn track - Analysis of track radii and greyhound weight
Eager, D
;
Hossain, I