Skip navigation
Statistics
Help
About OPUS
How to Deposit
Managing Copyright
Browse
UTS Organisational Groups
Browse Items by:
Issue Date
Author
Title
Type
ARC/NHRMC Funded
Search OPUS
OPUS at UTS
Browsing byAuthorAhmadian Fard Fini, A
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
or enter first few letters:
Sort by:
title
issue date
submit date
ARC/NHRMC funded
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 1 to 20 of 21
next >
Issue Date
Title
Author(s)
2022-12-20
A deep learning-based approach to facilitate the as-built state recognition of indoor construction works
Ekanayake, B
;
Ahmadian Fard Fini, A
;
Wong, JKW
;
Smith, P
2018-02
Dynamic Programming Approach toward Optimization of Workforce Planning Decisions
Ahmadian Fard Fini, A
;
Akbarnezhad, A
;
Rashidi, TH
;
Waller, ST
2018-04-01
Enhancing the safety of construction crew by accounting for brain resource requirements of activities in job assignment
Ahmadian Fard Fini, A
;
Akbarnezhad, A
;
Rashidi, TH
;
Waller, ST
2016-07-14
Factors Influencing BIM Adoption in Small and Medium Sized Construction Organizations
Hong, Y
;
Sepasgozar, SME
;
Ahmadian Fard Fini, A
;
Akbarnezhad, A
2016-05-01
Incorporating Multiskilling and Learning in the Optimization of Crew Composition
Ahmadian Fard Fini, A
;
Rashidi, TH
;
Akbarnezhad, A
;
Travis Waller, S
2017-05
Job Assignment Based on Brain Demands and Human Resource Strategies
Ahmadian Fard Fini, A
;
Akbarnezhad, A
;
Rashidi, TH
;
Waller, ST
2019-05-24
Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence
Brisland, R
;
Forsythe, P
;
Ahmadian Fard Fini, A
;
Al-Hussein, M
2021-12-01
Mass-customisation of cross-laminated timber wall systems at early design stages
Jalali Yazdi, A
;
Ahmadian Fard Fini, A
;
Forsythe, P
2018-01-01
A mathematical job allocation model to maximize career development opportunities for construction workers
Shahbazi, B
;
Akbarnezhad, A
;
Rey, D
;
Ahmadian Fard Fini, A
2016
A novel real-time detailed feedback collection and interaction tool for large classes
Ahmadian Fard Fini, A
;
Akbarnezha, A
;
Rashidi, TH
2019-11-01
Optimization of flexible lift processes on high-rise building construction sites
Jalali Yazdi, A
;
Forsythe, P
;
Ahmadian Fard Fini, A
;
Maghrebi, M
2019-06-01
Optimization of job allocation in construction organizations to maximize workers' career development opportunities
Shahbazi, B
;
Akbarnezhad, A
;
Rey, D
;
Ahmadian Fard Fini, A
;
Loosemore, M
2019-05-01
Productivity in Multi-storey Mass Timber Construction
Forsythe, P
;
Ahmadian Fard Fini, A
2018-08-06
Quantifying demolition fitout waste from Australian office buildings
Forsythe, P
;
Ahmadian Fard Fini, A
2021
Sonochemical Preparation of Magnesium Hydroxide and Aluminum Hydroxide Nanoparticles for Flame Retardancy and Thermal Stability of Cellulose Acetate and Wood
Ahmadian Fard Fini, A
;
Tamiji, M
;
Behzadi, M
;
Ghanbari, D
2019-01-03
Sustainable Procurement and Transport of Construction Materials
Ahmadian Fard Fini, A
;
Akbarnezhad, A
2021-10-28
Technical challenges for automated indoor construction progress monitoring
Ekanayake, B
;
Ahmadian Fard Fini, A
;
K-W Wong, J
2023-01-01
Tracking indoor construction progress by deep-learning-based analysis of site surveillance video
Wong, JKW
;
Bameri, F
;
Ahmadian Fard Fini, A
;
Maghrebi, M
2018
Trialling the Value of RFID Technology in Prefabricated Timber Construction
Forsythe, P
;
Ahmadian Fard Fini, A
2022-01-01
Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction
Ahmadian Fard Fini, A
;
Maghrebi, M
;
Forsythe, PJ
;
Waller, TS