Browsing byAuthorHwang, FJ

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 21 to 38 of 38< previous 
Issue DateTitleAuthor(s)
2020-11-13Multiple Linear Regression Based on Stream Homomorphic Encryption ComputingZhang, Y; Liu, Y; Chung, C-L; Chen, C-H; Hwang, FJ
2022-01-01Neuron-Network-Based Mixture Probability Model for Passenger Walking Time Distribution EstimationFang, H; Chen, CH; Chen, D; Hwang, FJ
2020-06Parallel and distributed architecture of genetic algorithm on Apache Hadoop and SparkLu, H-C; Hwang, FJ; Huang, Y-H
2020-03-01A probability density function generator based on neural networksChen, CH; Song, F; Hwang, FJ; Wu, L
2016-04-01Relocation scheduling subject to fixed processing sequencesLin, BMT; Hwang, FJ; Kononov, AV
2014-01-01Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequenceHwang, FJ; Kovalyov, MY; Lin, BMT
2021-10Spatial heterogeneity and migration characteristics of traffic congestion—A quantitative identification method based on taxi trajectory dataFu, X; Xu, C; Liu, Y; Chen, C-H; Hwang, FJ; Wang, J
2018-10-01Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machinesHwang, FJ; Lin, BMT
2021The operating room scheduling problem based on patient priorityMashkani, O; Hwang, FJ; Salehipour, A
2011-02-01Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job typeLin, BMT; Hwang, FJ
2012-02-01Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequenceHwang, FJ; Kovalyov, MY; Lin, BMT
2022-12-20Travel Time Prediction Method Based on Spatial-Feature-based Hierarchical Clustering and Deep Multi-input Gated Recurrent UnitFang, H; Liu, Y; Chen, CH; Hwang, FJ
2019-07-01Travel Time Prediction System Based on Data Clustering for Waste Collection VehiclesCHEN, C-H; Hwang, FJ; KUNG, H-Y
2019-01-01Travel time prediction system based on data clustering for waste collection vehiclesChen, CH; Hwang, FJ; Kung, HY
2017-06-01Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequenceLin, BMT; Hwang, FJ; Gupta, JND
2012-06-01Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequenceHwang, FJ; Lin, BMT
2016-03-01Two-stage flexible flow shop scheduling subject to fixed job sequencesHwang, FJ; Lin, BMT
2021Urban Public Transport Accessibility to Medical Services From the Perspective of Residents’ Travel: A Hybrid Assessment Based on the Whole ProcessFu, X; Qiang, Y; Wang, J; Zhao, X; Hwang, FJ; Chen, C-H