Showing results 16 to 35 of 38
< previous
next >
Issue Date | Title | Author(s) |
2018-09-01 | Introduction to the special issue: Applications of internet of things | Chen, CH; Al-Masri, E; Hwang, FJ; Ktoridou, D; Lo, KR |
2022-12-01 | Machine learning and deep learning methods for wireless network applications | Chen, ACH; Jia, WK; Hwang, FJ; Liu, G; Song, F; Pu, L |
2019-11-01 | Makespan minimization for the m-machine ordered flow shop scheduling problem | Khatami, M; Salehipour, A; Hwang, FJ |
2009-01 | Makespan minimization in parallel flow shops | Sevastyanov, S; Lin, B; Hwang, FJ; Stein, C |
2021-04-02 | Maritime target detection based on electronic image stabilization technology of shipborne camera | Shan, X; Pang, M; Zhao, D; Wang, D; Hwang, FJ; CHEN, C-H |
2020-11-13 | Multiple Linear Regression Based on Stream Homomorphic Encryption Computing | Zhang, Y; Liu, Y; Chung, C-L; Chen, C-H; Hwang, FJ |
2022-01-01 | Neuron-Network-Based Mixture Probability Model for Passenger Walking Time Distribution Estimation | Fang, H; Chen, CH; Chen, D; Hwang, FJ |
2020-06 | Parallel and distributed architecture of genetic algorithm on Apache Hadoop and Spark | Lu, H-C; Hwang, FJ; Huang, Y-H |
2020-03-01 | A probability density function generator based on neural networks | Chen, CH; Song, F; Hwang, FJ; Wu, L |
2016-04-01 | Relocation scheduling subject to fixed processing sequences | Lin, BMT; Hwang, FJ; Kononov, AV |
2014-01-01 | Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence | Hwang, FJ; Kovalyov, MY; Lin, BMT |
2021-10 | Spatial heterogeneity and migration characteristics of traffic congestion—A quantitative identification method based on taxi trajectory data | Fu, X; Xu, C; Liu, Y; Chen, C-H; Hwang, FJ; Wang, J |
2018-10-01 | Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines | Hwang, FJ; Lin, BMT |
2021 | The operating room scheduling problem based on patient priority | Mashkani, O; Hwang, FJ; Salehipour, A |
2011-02-01 | Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type | Lin, BMT; Hwang, FJ |
2012-02-01 | Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence | Hwang, FJ; Kovalyov, MY; Lin, BMT |
2022-12-20 | Travel Time Prediction Method Based on Spatial-Feature-based Hierarchical Clustering and Deep Multi-input Gated Recurrent Unit | Fang, H; Liu, Y; Chen, CH; Hwang, FJ |
2019-07-01 | Travel Time Prediction System Based on Data Clustering for Waste Collection Vehicles | CHEN, C-H; Hwang, FJ; KUNG, H-Y |
2019-01-01 | Travel time prediction system based on data clustering for waste collection vehicles | Chen, CH; Hwang, FJ; Kung, HY |
2017-06-01 | Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence | Lin, BMT; Hwang, FJ; Gupta, JND |