Skip navigation
Statistics
Help
About OPUS
How to Deposit
Managing Copyright
Browse
UTS Organisational Groups
Browse Items by:
Issue Date
Author
Title
Type
ARC/NHRMC Funded
Search OPUS
OPUS at UTS
Browsing byAuthorHwang, FJ
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
or enter first few letters:
Sort by:
title
issue date
submit date
ARC/NHRMC funded
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 25 to 38 of 38
< previous
Issue Date
Title
Author(s)
2016-04-01
Relocation scheduling subject to fixed processing sequences
Lin, BMT
;
Hwang, FJ
;
Kononov, AV
2014-01-01
Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequence
Hwang, FJ
;
Kovalyov, MY
;
Lin, BMT
2021-10
Spatial heterogeneity and migration characteristics of traffic congestion—A quantitative identification method based on taxi trajectory data
Fu, X
;
Xu, C
;
Liu, Y
;
Chen, C-H
;
Hwang, FJ
;
Wang, J
2018-10-01
Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines
Hwang, FJ
;
Lin, BMT
2021
The operating room scheduling problem based on patient priority
Mashkani, O
;
Hwang, FJ
;
Salehipour, A
2011-02-01
Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type
Lin, BMT
;
Hwang, FJ
2012-02-01
Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequence
Hwang, FJ
;
Kovalyov, MY
;
Lin, BMT
2022-12-20
Travel Time Prediction Method Based on Spatial-Feature-based Hierarchical Clustering and Deep Multi-input Gated Recurrent Unit
Fang, H
;
Liu, Y
;
Chen, CH
;
Hwang, FJ
2019-07-01
Travel Time Prediction System Based on Data Clustering for Waste Collection Vehicles
CHEN, C-H
;
Hwang, FJ
;
KUNG, H-Y
2019-01-01
Travel time prediction system based on data clustering for waste collection vehicles
Chen, CH
;
Hwang, FJ
;
Kung, HY
2017-06-01
Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequence
Lin, BMT
;
Hwang, FJ
;
Gupta, JND
2012-06-01
Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequence
Hwang, FJ
;
Lin, BMT
2016-03-01
Two-stage flexible flow shop scheduling subject to fixed job sequences
Hwang, FJ
;
Lin, BMT
2021
Urban Public Transport Accessibility to Medical Services From the Perspective of Residents’ Travel: A Hybrid Assessment Based on the Whole Process
Fu, X
;
Qiang, Y
;
Wang, J
;
Zhao, X
;
Hwang, FJ
;
Chen, C-H