Browsing byARC/NHMRC Funded

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 13450 to 13469 of 102469< previous   next >
Issue DateTitleAuthor(s)
2023-04-13My V2X EV: Informing strategic electric vehicle integrationDwyer, S
2023-01-01The Australian Electricity Workforce for the 2022 Integrated System Plan: Projections to 2050.Rutovitz, J; Langdon, R; Mey, F; Briggs, C
2021-07-02E1 Theme: Trust-building for collaborative win-win customer solutions. Opportunity Assessment Roadmap ReportRussell-Bennett, R; Kuch, D; Riedy, C; Gardner, J; Chong, HYJ; Niklas, S; Clements, A; Flew, T; Mathmann, F; McAndrew, R; Letheren, K; Minunno, R; Amin, R; Goulding, B; Zimbatu, A; Whittaker, L
2021-08-01Opportunity Assessment: Network Visibility and Optimising Hosting CapacityDwyer, S; Braslavsky, J; Graham, P; Havas, L; Heslop, S; Hossain, J; Ibrahim, I; Amin, R; Khorasany, M; Langham, E; Nagrath, K; Guerrero Orbe, J; Razzaghi, R; Sherman, J; Spak, B
2022-12-01Local DER Network Solutions. Opportunity Assessment in N3 for RACE for 2030Wright, S; Dwyer, S
2021-08-01N1 Opportunity Assessment: Electric Vehicles and the Grid.Dwyer, S; Dargaville, R; Nagrath, K; Thorpe, A; Milton, A; James, B; McGrath, B; Hargroves, C; Kuch, D; Meegahapola, L; Newman, P; Paevere, P
2022-12-01Industry 4.0 for energy productivity – Opportunity Assessment for Research Theme B2, Final ReportTrianni, A; Bennett, N; Lindsay, D
2020-08-13A short overview of the research undertaken by UTS to improve the safety and welfare of greyhoundsEager, D
2020-08-01A review of the track shapes, cross-fall, race dynamics and injury rates for RWWAEager, D; Hossain, MI; Hayati, H; Mahdavi, F
2020-09-21RWWA Report 3 - Track surface maintenance - Cannington Mandurah and Northam greyhound tracksEager, D; Hossain, MI
2020-09-01RWWA Report 2 - Starting Box and Catch Pens - Cannington Mandurah and Northam greyhound tracksEager, D; Hossain, MI
2021-03-30Report 8 Mandurah greyhound track upgrade - Design~3 catching pen analysisHossain, I; Eager, D
-GBGC Industry Stackholder Engagement - Open Forum for participantsEager, D
-GBGC Industry Stackholder Engagement - Ipswich GRCEager, D
2020-11-30Greater Brisbane Greyhound Centre - Analysis of 6 starts for the 2-turn trackEager, D; Hossain, I
-GBGC Industry Stackholder Engagement - QRICEager, D
-GBGC Industry Stackholder Engagement - Greyhound Advisory PanelEager, D
-GBGC Industry Stackholder Engagement - Interstate learningsEager, D
-GBGC Industry Stackholder Engagement - Tom Tzouvelis Trainers GroupEager, D
2021-01-11GBGC 2-turn track - Analysis of track radii and greyhound weightEager, D; Hossain, I