Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job type
- Publication Type:
- Journal Article
- Citation:
- Information Processing Letters, 2011, 111 (5), pp. 208 - 212
- Issue Date:
- 2011-02-01
Closed Access
Filename | Description | Size | |||
---|---|---|---|---|---|
2012001328OK.pdf | 221.63 kB |
Copyright Clearance Process
- Recently Added
- In Progress
- Closed Access
This item is closed access and not available.
This paper addresses the total completion time minimization in a two-stage differentiation flowshop where the sequences of jobs per type are predetermined. The two-stage differentiation flowshop consists of a stage-1 common machine and m stage-2 parallel dedicated machines. The goal is to determine an optimal interleaved processing sequence of all jobs at the first stage. We propose an O(m2∏mk=1nm+1k) dynamic programming algorithm, where nk is the number of type-k jobs. The running time is polynomial when m is constant. © 2010 Elsevier B.V.
Please use this identifier to cite or link to this item: