BIM-FM and information requirements management: Missing links in the AEC and FM interface
- Publication Type:
- Conference Proceeding
- Citation:
- IFIP Advances in Information and Communication Technology, 2017, 517 pp. 311 - 323
- Issue Date:
- 2017-01-01
Closed Access
Filename | Description | Size | |||
---|---|---|---|---|---|
Paper_ID155_JuppAwad_PLM2017_FinalSubmission.pdf | Published version | 626.22 kB |
Copyright Clearance Process
- Recently Added
- In Progress
- Closed Access
This item is closed access and not available.
© IFIP International Federation for Information Processing 2017. A steady shift in the value added from building information modelling (BIM) to architectural, engineering and construction (AEC) activities to those of facilities management (FM) is seeing increasing emphasis on whole-of-life thinking and associated information requirements management practices. Little is known about the process of identifying, documenting, generating and harmonizing BIM data inputs with FM data outputs in the Australian construction industry. Grounded on empirical evidence from a case study that transverses client and project team perspectives, this exploratory paper identifies missing links in the AEC and FM interface. The study describes the issues surrounding the collection and harmonization of BIM data inputs (as-built deliverables at handover) and the identification of (and connection to) FM data outputs. With the limitation of an exploratory and interpretive case study, the intention is to provide a contribution to academics and practitioners with grounded, stakeholder-related insights.
Please use this identifier to cite or link to this item: