Quality Assurance of Shotcrete on a Railway Line Project
- Publisher:
- ACC Limited
- Publication Type:
- Journal Article
- Citation:
- The Indian Concrete Journal, 2016, 90 (6)
- Issue Date:
- 2016-06-01
Closed Access
Filename | Description | Size | |||
---|---|---|---|---|---|
Quality assurance for railway shotcrete.doc | Accepted Manuscript Version | 10.05 MB |
Copyright Clearance Process
- Recently Added
- In Progress
- Closed Access
This item is closed access and not available.
Specification for shotcrete specifies control over slump, time lag between batching and placing, compressive strength, shotcrete thickness, density and permeability. The wet-mix shotcrete is required to have quality control over the workability for easy pneumatic placement, minimum rebound and good compaction. This paper reports the quality assurance experience gained from a project involving 2700 cubic metre of shotcrete, during the construction of 35 km long Southern Sydney Freight Line project, lasted over 3 years. The field experience showed that quality assurance specification for shotcrete mix must be followed to ensure the quality of placed shotcrete.
Please use this identifier to cite or link to this item: