Skip navigation
Statistics
Help
About OPUS
How to Deposit
Managing Copyright
Browse
UTS Organisational Groups
Browse Items by:
Issue Date
Author
Title
Type
ARC/NHRMC Funded
Search OPUS
OPUS at UTS
Browsing byAuthorAhmadian Fard Fini, A
Jump to:
0-9
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
or enter first few letters:
Sort by:
title
issue date
submit date
ARC/NHRMC funded
In order:
Ascending
Descending
Results/Page
5
10
15
20
25
30
35
40
45
50
55
60
65
70
75
80
85
90
95
100
Authors/Record:
All
1
5
10
15
20
25
30
35
40
45
50
Showing results 10 to 21 of 21
< previous
Issue Date
Title
Author(s)
2016
A novel real-time detailed feedback collection and interaction tool for large classes
Ahmadian Fard Fini, A
;
Akbarnezha, A
;
Rashidi, TH
2019-11-01
Optimization of flexible lift processes on high-rise building construction sites
Jalali Yazdi, A
;
Forsythe, P
;
Ahmadian Fard Fini, A
;
Maghrebi, M
2019-06-01
Optimization of job allocation in construction organizations to maximize workers' career development opportunities
Shahbazi, B
;
Akbarnezhad, A
;
Rey, D
;
Ahmadian Fard Fini, A
;
Loosemore, M
2019-05-01
Productivity in Multi-storey Mass Timber Construction
Forsythe, P
;
Ahmadian Fard Fini, A
2018-08-06
Quantifying demolition fitout waste from Australian office buildings
Forsythe, P
;
Ahmadian Fard Fini, A
2021
Sonochemical Preparation of Magnesium Hydroxide and Aluminum Hydroxide Nanoparticles for Flame Retardancy and Thermal Stability of Cellulose Acetate and Wood
Ahmadian Fard Fini, A
;
Tamiji, M
;
Behzadi, M
;
Ghanbari, D
2019-01-03
Sustainable Procurement and Transport of Construction Materials
Ahmadian Fard Fini, A
;
Akbarnezhad, A
2021-10-28
Technical challenges for automated indoor construction progress monitoring
Ekanayake, B
;
Ahmadian Fard Fini, A
;
K-W Wong, J
2023-01-01
Tracking indoor construction progress by deep-learning-based analysis of site surveillance video
Wong, JKW
;
Bameri, F
;
Ahmadian Fard Fini, A
;
Maghrebi, M
2018
Trialling the Value of RFID Technology in Prefabricated Timber Construction
Forsythe, P
;
Ahmadian Fard Fini, A
2022-01-01
Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction
Ahmadian Fard Fini, A
;
Maghrebi, M
;
Forsythe, PJ
;
Waller, TS
2019-05-24
The Value Proposition of RFIDTechnology in Tall Prefabricated Timber Buildings
Forsythe, P
;
Ahmadian Fard Fini, A
;
Jalali Yazdi, A
;
Al-Hussein, M