Browsing byAuthorForsythe, P

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 10 to 29 of 46< previous   next >
Issue DateTitleAuthor(s)
2016-01-01A comparative study of floor construction on sloping sites: An analysis of cumulative energy demand and greenhouse gas emissionsDing, G; Forsythe, P
2014-01-01Complaints and disputes among occupants within apartment developmentsForsythe, P; Antoniades, H
2006-06-20Consumer-perceived appearance tolerances in construction quality managementForsythe, P
2011-01-01Drivers of Housing Demolition Decision Making and the Impact on Timber Waste ManagementForsythe, P
2016Dynamic modelling of cranes and concrete pumps diffusion in the construction industrySepasgozar, S; Forsythe, P; Cheng, JCP; Dawood, N; Kuang, JS
2018-12-01Evaluation of Terrestrial and Mobile Scanner Technologies for Part-Built Information ModelingSepasgozar, SME; Forsythe, P; Shirowzhan, S
2019-07-01EXPLORING INTERDISCIPLINARY COLLABORATION IN THE DETAILED DESIGN PHASE OF CONSTRUCTION PROJECTSSalam, M; Forsythe, P; Killen, C; Abd Al Salam, M
2018-12-02Extending and operationalizing construction productivity measurement on building projectsForsythe, P
2014-01-01Greenhouse gas emissions from excavation on residential construction sitesForsythe, P; Ding, G
2015-01-01How far can BIM reduce information asymmetry in the Australian construction context?Forsythe, P; Sankaran, S; Biesenthal, C
2017-10-01Increasing wood based office fitout for sustainable life cycle benefitsForsythe, P; Ding, KG
2016-10-02Innovative construction and the role of boundary objects: a Gehry case studyNaar, L; Nikolova, N; Forsythe, P
2007-01An instrument for measuring customer perceived service quality in housing constructionForsythe, PJ; Forsythe, P
2019-05-24Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation SequenceBrisland, R; Forsythe, P; Ahmadian Fard Fini, A; Al-Hussein, M
2021-12-01Mass-customisation of cross-laminated timber wall systems at early design stagesJalali Yazdi, A; Ahmadian Fard Fini, A; Forsythe, P
2015-01-01Measuring office fit-out changes to determine recurring embodied energy in building life cycle assessmentForsythe, P; Wilkinson, S
2013-01-01Modeling resource management in the building design process by information constraint Petri netsCheng, F; Li, H; Wang, YW; Skitmore, M; Forsythe, P
2008-09-29Modelling customer perceived service quality in housing constructionForsythe, P
2015-01-01Monitoring customer perceived service quality and satisfaction during the construction processForsythe, P
2019-11-01Optimization of flexible lift processes on high-rise building construction sitesJalali Yazdi, A; Forsythe, P; Ahmadian Fard Fini, A; Maghrebi, M