Browsing byAuthorHossain, MI

Jump to: 0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
or enter first few letters:  
Showing results 39 to 58 of 67< previous   next >
Issue DateTitleAuthor(s)
2018-02-19Mt Gambier Track Design Analysis of Drawing 5135Eager, D; Hossain, MI
2018-01-22Mt Gambier Track Injury Analysis and Preliminary Design ReportEager, D; Hayati, H; Hossain, MI
2020-10-05Multiphysical analysis of nanoparticles and their effects on plants.Chowdhury, MA; Shuvho, MBA; Hossain, MI; Ali, MO; Kchaou, M; Rahman, A; Yeasmin, N; Khan, AS; Rahman, MA; Mofijur, M
2021-05-07North West Greyhound and Harness TrackEager, D; Hossain, MI
2021-08-10North West Greyhound and Harness Track Greyhound track outside Harness track Concept 6Eager, D; Hossain, MI
2021-09-14North West Greyhound and Harness Tracks Comparison of four inner track designs with the outside C-shaped track designEager, D; Hossain, MI
2021-10-01North West Greyhound and Harness Tracks Four inner greyhound track design variations for discussionEager, D; Hossain, MI
2022-11-29North West Greyhound and Harness Tracks Preferred greyhound track designEager, D; Hossain, MI
2021-11-01North West Greyhound and Harness Tracks Report 8: Dynamic modelling and optimisation of the Option H greyhound track designEager, D; Hossain, MI
2021-03-14Northam greyhound track upgrade Report 7 – Review of the proposed refurbishmentEager, D; Hossain, MI
2023-05-04Predicting greyhound speed in the race by creating a historical data plane of race dataHossain, MI; Eager, D
2017-03-24A preliminary investigation into the Cranbourne Track for Greyhound Racing VictoriaEager, D; Hayati, H; Hossain, MI
2024-02-07Rapid quadrupedal locomotion: a study of greyhound galloping mechanicsHossain, MI; Eager, D
2017-04-26Rate of rotation report The GardensHossain, MI; Eager, D
2022-07-15Results and recommendations from on-track testing of impact attenuation padding for injury preventionEager, D; Hossain, MI
2020-09-01RWWA Report 2 - Starting Box and Catch Pens - Cannington Mandurah and Northam greyhound tracksEager, D; Hossain, MI
2020-09-21RWWA Report 3 - Track surface maintenance - Cannington Mandurah and Northam greyhound tracksEager, D; Hossain, MI
2021-10-11Sale Greyhound Track - Analysis of four proposed track modificationsEager, D; Hossain, MI
2019-01-19Shepparton track analysis 1 July 2015 to 30 June 2018Mahdavi, F; Hossain, MI; Stephenson, R; Thomas, N; Hayati, H; Eager, D
2021-07-16Shepparton track – Evaluation of a proposed 500 m startEager, D; Hossain, MI; Ishac, K