Issue Date | Title | Author(s) |
2022-12-20 | A deep learning-based approach to facilitate the as-built state recognition of indoor construction works | Ekanayake, B; Ahmadian Fard Fini, A; Wong, JKW; Smith, P |
2018-02 | Dynamic Programming Approach toward Optimization of Workforce Planning Decisions | Ahmadian Fard Fini, A; Akbarnezhad, A; Rashidi, TH; Waller, ST |
2018-04-01 | Enhancing the safety of construction crew by accounting for brain resource requirements of activities in job assignment | Ahmadian Fard Fini, A; Akbarnezhad, A; Rashidi, TH; Waller, ST |
2016-07-14 | Factors Influencing BIM Adoption in Small and Medium Sized Construction Organizations | Hong, Y; Sepasgozar, SME; Ahmadian Fard Fini, A; Akbarnezhad, A |
2016-05-01 | Incorporating Multiskilling and Learning in the Optimization of Crew Composition | Ahmadian Fard Fini, A; Rashidi, TH; Akbarnezhad, A; Travis Waller, S |
2017-05 | Job Assignment Based on Brain Demands and Human Resource Strategies | Ahmadian Fard Fini, A; Akbarnezhad, A; Rashidi, TH; Waller, ST |
2019-05-24 | Mass Timber Productivity- the Significance of Reduction in Non-Value Add Activities during On-Site Installation Sequence | Brisland, R; Forsythe, P; Ahmadian Fard Fini, A; Al-Hussein, M |
2021-12-01 | Mass-customisation of cross-laminated timber wall systems at early design stages | Jalali Yazdi, A; Ahmadian Fard Fini, A; Forsythe, P |
2018-01-01 | A mathematical job allocation model to maximize career development opportunities for construction workers | Shahbazi, B; Akbarnezhad, A; Rey, D; Ahmadian Fard Fini, A |
2016 | A novel real-time detailed feedback collection and interaction tool for large classes | Ahmadian Fard Fini, A; Akbarnezha, A; Rashidi, TH |
2019-11-01 | Optimization of flexible lift processes on high-rise building construction sites | Jalali Yazdi, A; Forsythe, P; Ahmadian Fard Fini, A; Maghrebi, M |
2019-06-01 | Optimization of job allocation in construction organizations to maximize workers' career development opportunities | Shahbazi, B; Akbarnezhad, A; Rey, D; Ahmadian Fard Fini, A; Loosemore, M |
2019-05-01 | Productivity in Multi-storey Mass Timber Construction | Forsythe, P; Ahmadian Fard Fini, A |
2018-08-06 | Quantifying demolition fitout waste from Australian office buildings | Forsythe, P; Ahmadian Fard Fini, A |
2021 | Sonochemical Preparation of Magnesium Hydroxide and Aluminum Hydroxide Nanoparticles for Flame Retardancy and Thermal Stability of Cellulose Acetate and Wood | Ahmadian Fard Fini, A; Tamiji, M; Behzadi, M; Ghanbari, D |
2019-01-03 | Sustainable Procurement and Transport of Construction Materials | Ahmadian Fard Fini, A; Akbarnezhad, A |
2021-10-28 | Technical challenges for automated indoor construction progress monitoring | Ekanayake, B; Ahmadian Fard Fini, A; K-W Wong, J |
2018 | Trialling the Value of RFID Technology in Prefabricated Timber Construction | Forsythe, P; Ahmadian Fard Fini, A |
2022-01-01 | Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction | Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, PJ; Waller, TS |
2019-05-24 | The Value Proposition of RFIDTechnology in Tall Prefabricated Timber Buildings | Forsythe, P; Ahmadian Fard Fini, A; Jalali Yazdi, A; Al-Hussein, M |