Deconstruction waste management through 3d reconstruction and bim: a case study

Publication Type:
Journal Article
Citation:
Visualization in Engineering, 2017, 5 (1)
Issue Date:
2017-12
Full metadata record
Files in This Item:
Filename Description Size
Janet_10.1186_s40327-017-0050-5.pdfPublished Version3.16 MB
Adobe PDF
Please use this identifier to cite or link to this item: