Showing results 1 to 20 of 1954
next >
Issue Date | Title | Author(s) |
2022-09-08 | Development of a refined illumination and reflectance approach for optimal construction site interior image enhancement | Wong, KW; Mojtaba, M; Alireza, AFF; Mohammad, AAG; Mahdi, A; Michael, E |
2023-01-01 | Tracking indoor construction progress by deep-learning-based analysis of site surveillance video | Wong, JKW; Bameri, F; Ahmadian Fard Fini, A; Maghrebi, M |
2023-10-07 | Specialist Disability Accommodation (SDA) in New South Wales: Analysis of the National Disability Insurance Agency SDA-Enrolled Dwelling Dataset | Carnemolla, P; Gill-Finnegan, T; Herath, S; Ghosh, S; Taylor, M; Callaway, L; Robinson, S; Darcy, S; Wiesel, I; Council for Intellectual Disability |
2024 | Australian Case: Black Summer Bushfires | Abd Al Salam, M; Wu, S; Lohi, I; Wain, A; Fleck, R; Wilkinson, S; Banihashemi, S; Hajirasouli, A; Towart, L; Toivonen, S; Heinonen, S; Verma, I; Castaño-Rosa, R; Wilkinson, S |
2022-01-01 | Using existing site surveillance cameras to automatically measure the installation speed in prefabricated timber construction | Ahmadian Fard Fini, A; Maghrebi, M; Forsythe, PJ; Waller, TS |
2018-03-01 | Expanding The Living Architecture In Australia | Wilkinson, SJ; Brown, P; Ghosh, S |
2015-07-08 | BIM and the Value Dimension: A Commercial Property Development and Management Perspective | Wilkinson, S; Jupp, JR |
2015-07-08 | Through-life Information Management For Commercial Property Practice: Benefits & Challenges of BIM | Jupp, JR; Wilkinson, S |
2020-09 | An algorithm for single- and multiple-runway aircraft landing problem | Salehipour, A |
2020-01-01 | A new approach for sensitivity analysis in network flow problems | Aini, A; Eshghi, K; Salehipour, A |
2021-01-01 | A meta-heuristic to solve the just-in-time job-shop scheduling problem | Ahmadian, MM; Salehipour, A; Cheng, TCE |
2021-03-01 | Four decades of research on the open-shop scheduling problem to minimize the makespan | Ahmadian, MM; Khatami, M; Salehipour, A; Cheng, TCE |
2021-04-15 | Coupled task scheduling with convex resource consumption functions | Mosheiov, G; Oron, D; Salehipour, A |
2021-01-01 | Heuristic Solutions for the (α, β) -k Feature Set Problem | Naeni, LM; Salehipour, A |
2021 | A matheuristic for practical flights arrival and departure scheduling | Ahmadian, MM; Salehipour, A |
2020 | A New Mathematical Model for the Traveling Repairman Problem | Naeni, LM; Salehipour, A |
2020-01-01 | A heuristic algorithm for the set k-cover problem | Salehipour, A |
2023-09-01 | Flow-shop scheduling with exact delays to minimize makespan | Khatami, M; Salehipour, A; Cheng, TCE |
2007-01-01 | An exploratory cognitive business intelligence system | Niu, L; Lu, J; Chew, E; Zhang, G; Haas, LL; Kacprzyk, J; Motwani, R; Broder, A; Ho, H |
2016-10-01 | Rental Discrimination in the Multi-ethnic Metropolis: Evidence from Sydney | MacDonald, H; Nelson, J; Galster, G; Paradies, Y; Dunn, K; Dufty-Jones, R |