Browsing by Author Hwang, FJ

0-9 A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Showing results 1 to 20 of 20
Issue DateTitleAuthor(s)
1-Dec-2016Acquisition planning and scheduling of computing resourcesYang, CN; Lin, BMT; Hwang, FJ; Wang, MC
26-Aug-2017An Augmented Reality Question Answering System Based on Ensemble Neural NetworksChen, CH; Wu, CL; Lo, CC; Hwang, FJ
25-Jul-2016Bi-criteria sequencing of courses and formation of classes for a bottleneck classroomCzibula, OG; Gu, H; Hwang, FJ; Kovalyov, MY; Zinder, Y
1-May-2011Coupled-task scheduling on a single machine subject to a fixed-job-sequenceHwang, FJ; Lin, BMT
20-Mar-2019Deep learning techniques for agronomy applicationsChen, CH; Kung, HY; Hwang, FJ
1-Jul-2016An effective placement method for the single container loading problemHuang, YH; Hwang, FJ; Lu, HC
3-Oct-2018Global optimization for the three-dimensional open-dimension rectangular packing problemHuang, YH; Hwang, FJ
1-Sep-2018Introduction to the special issue: Applications of internet of thingsChen, CH; Al-Masri, E; Hwang, FJ; Ktoridou, D; Lo, KR
1-Nov-2019Makespan minimization for the m-machine ordered flow shop scheduling problemKhatami, M; Salehipour, A; Hwang, FJ
Jan-2009Makespan minimization in parallel flow shopsSevastyanov, S; Lin, B; Hwang, FJ; Stein, C
Nov-2019A probability density function generator based on neural networksChen, C-H; Song, F; Hwang, FJ; Wu, L
1-Apr-2016Relocation scheduling subject to fixed processing sequencesLin, BMT; Hwang, FJ; Kononov, AV
1-Jan-2014Scheduling for fabrication and assembly in a two-machine flowshop with a fixed job sequenceHwang, FJ; Kovalyov, MY; Lin, BMT
1-Oct-2018Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machinesHwang, FJ; Lin, BMT
1-Feb-2011Total completion time minimization in a 2-stage differentiation flowshop with fixed sequences per job typeLin, BMT; Hwang, FJ
1-Feb-2012Total completion time minimization in two-machine flow shop scheduling problems with a fixed job sequenceHwang, FJ; Kovalyov, MY; Lin, BMT
1-Jan-2019Travel time prediction system based on data clustering for waste collection vehiclesChen, CH; Hwang, FJ; Kung, HY
1-Jun-2017Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequenceLin, BMT; Hwang, FJ; Gupta, JND
1-Jun-2012Two-stage assembly-type flowshop batch scheduling problem subject to a fixed job sequenceHwang, FJ; Lin, BMT
1-Mar-2016Two-stage flexible flow shop scheduling subject to fixed job sequencesHwang, FJ; Lin, BMT